50 bhp horizontal boilers

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :50 bhp horizontal boilers
  • Supply Capacity : 10 units/month :50 bhp horizontal boilers
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Instruction, Operation, and Maintenance Manual Boilers

    Boilers and Unfired Steam Generators Please note that the water chemistry is different for carbon steel vs. stainless steel pressure vessels and vertical vs. horizontal orientation. Effective immediately, please use the limits below. Should you have any questions, please do not hesitate to contact Fulton at 315-298-5121.Get Price

  • HVAC Design Overview of Variable Air Volume Systems

    The resulting BHP is: BHP 2 = [RPM 2 /RPM 1] 3 x BHP 1 BHP 2 = [750 /1000] 3 x 5 = 2.11 handling unit, chillers, and boilers to run a part load majority of time. 2. in the vertical and horizontal directions. As a rule of thumb, the linear duct length before .Get Price

  • Combustion Evaluation: Sources and Control Devices

    In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price

  • Mechanical Engineering Problems With Solution - DocShare.tips

    2.Scooter engine: Air arid petrol enter and burnt gases leave the engine. The engine delivers mechanical energy to the wheels. 3. Boilers, turbines, heat exchangers. Fluid flow through them and heat or work is taken out or supplied to them. Most of the engineering machines and equipment are open systems.Get Price

  • Instruction, Operation, and Maintenance Manual Boilers

    Boilers and Unfired Steam Generators Please note that the water chemistry is different for carbon steel vs. stainless steel pressure vessels and vertical vs. horizontal orientation. Effective immediately, please use the limits below. Should you have any questions, please do not hesitate to contact Fulton at 315-298-5121.Get Price

  • DAE e-Tenders | Public Tenders | Offline Tenders | Online

    Spares for IBR approved Horizontal Wet back 3 Pass Smoke Tube Boiler 0 : 17/01/2022 14:30:00 20 Days Left!! 71234 : SUPPLY & SAFE DOOR DELIVERY OF UHP ARGON GAS IN SUPPLIER'S OWN CYLINDERS OF 47 liters WC AS PER ATTACHED ANNEXURE-I. Supply of Flange type Vertical Immersion Heater confirming to IS 4159 & IS302-1 for Hot water Generator Get Price

  • HVAC Design Overview of Variable Air Volume Systems

    The resulting BHP is: BHP 2 = [RPM 2 /RPM 1] 3 x BHP 1 BHP 2 = [750 /1000] 3 x 5 = 2.11 handling unit, chillers, and boilers to run a part load majority of time. 2. in the vertical and horizontal directions. As a rule of thumb, the linear duct length before .Get Price