250 bhp steam boiler price
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
D Steam leaves an industrial boiler at 827.4 Kpa and 171.6 deg. C. A portion of the steam is passed through a throttling calorimeter and is exhausted to the atmosphere when the calorimeter pressure is 101.4 Kpa. How much moisture does the steam leaving the boiler contain if the temperature of the steam at the calorimeter is 115.6 Deg. C.Get Price
Each boiler was capable of producing 3,550,000 lb of steam per hour at 2,400 p.s.i.g. and 541 deg C at the superheated outlet, with reheat of 2,900,000 lb per hour from 348 to 541 deg C and 590 psig at the reheater outlet, based on a final feed temperature at the economiser inlet of 254 degC. In order to take advantage of the price and Get Price
D Steam leaves an industrial boiler at 827.4 Kpa and 171.6 deg. C. A portion of the steam is passed through a throttling calorimeter and is exhausted to the atmosphere when the calorimeter pressure is 101.4 Kpa. How much moisture does the steam leaving the boiler contain if the temperature of the steam at the calorimeter is 115.6 Deg. C.Get Price
Coe 47' x 26' Package type dry Kiln with Controls, 1989 Hurst gas boiler 150 PSI, 6900# Steam Per Hour S/N 51000-750-3, Condensate Tank & Pumps & Electrical. can Buy as a Package or Seperate the Hurst Boiler.Get Price
Combined cycle gas turbine (CCGT) – primary gas turbine with secondary steam turbine, with 55-60% thermal efficiency. Open cycle gas turbine – 35-40% efficiency, or straight steam boiler with about 40% efficiency; favoured for backing up intermittent renewables, due to quick start. All of these have potential for CCS.Get Price
Each boiler was capable of producing 3,550,000 lb of steam per hour at 2,400 p.s.i.g. and 541 deg C at the superheated outlet, with reheat of 2,900,000 lb per hour from 348 to 541 deg C and 590 psig at the reheater outlet, based on a final feed temperature at the economiser inlet of 254 degC. In order to take advantage of the price and Get Price
Coe 47' x 26' Package type dry Kiln with Controls, 1989 Hurst gas boiler 150 PSI, 6900# Steam Per Hour S/N 51000-750-3, Condensate Tank & Pumps & Electrical. can Buy as a Package or Seperate the Hurst Boiler.Get Price
Combined cycle gas turbine (CCGT) – primary gas turbine with secondary steam turbine, with 55-60% thermal efficiency. Open cycle gas turbine – 35-40% efficiency, or straight steam boiler with about 40% efficiency; favoured for backing up intermittent renewables, due to quick start. All of these have potential for CCS.Get Price